{"id":1950,"date":"2024-04-25T16:43:41","date_gmt":"2024-04-25T08:43:41","guid":{"rendered":"https:\/\/wanzhisteels.com\/?p=1950"},"modified":"2024-07-22T17:03:49","modified_gmt":"2024-07-22T09:03:49","slug":"binding-technology-of-column-reinforcement","status":"publish","type":"post","link":"https:\/\/wanzhisteels.com\/fr\/binding-technology-of-column-reinforcement\/","title":{"rendered":"Binding Technology Of Column Reinforcement"},"content":{"rendered":"<div class=\"wp-block-uagb-advanced-heading uagb-block-22d3f238\"><h2 class=\"uagb-heading-text\">Column Reinforcement Lashing Technique<\/h2><\/div>\n\n\n\n<p>1. Column reinforcement Process flow:  <\/p>\n\n\n\n<p>Connection of vertical load-bearing bars \u2192 drawing of stirrup spacing line \u2192 setting column stirrup \u2192 binding stirrup<\/p>\n\n\n\n<p>2. The connection mode of stress-bearing reinforcement must meet the design requirements.<\/p>\n\n\n\n<p>3. Draw the stirrup spacing line: <\/p>\n\n\n\n<p>On the vertical reinforcement of the column, mark the stirrup spacing line with chalk according to the drawing requirements.<\/p>\n\n\n\n<p>4. Stirrup of column sleeve: <\/p>\n\n\n\n<p>According to the spacing required by the drawing, calculate the number of stirrups of each column. Firstly, the stirrup shall be set on the lap bar extended at the lower layer, and then the column reinforcement shall be erected. Within the overlapping length, there shall be no less than 3 buckles, and the binding buckles shall be toward the center of the column. <\/p>\n\n\n\n<p>If the main reinforcement of the column is overlapped with plain round reinforcement, the angle of the corner hook and the formwork shall be 45 \u00b0 and 90 \u00b0 respectively.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-uagb-image uagb-block-4d0146d8 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Column-binding-Construction.jpg ,https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Column-binding-Construction.jpg 780w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Column-binding-Construction.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Column-binding-Construction.jpg\" alt=\"Column Reinforcement - Building reinforcement\" class=\"uag-image-4221\" width=\"1024\" height=\"768\" title=\"Column-binding-Construction\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-uagb-image uagb-block-871c9c03 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/steel-reinforcement.jpg ,https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/steel-reinforcement.jpg 780w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/steel-reinforcement.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/steel-reinforcement.jpg\" alt=\"Building reinforcement\" class=\"uag-image-4222\" width=\"1024\" height=\"768\" title=\"steel-reinforcement\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n<\/div>\n\n\n\n<p>5. Column stirrup binding<\/p>\n\n\n\n<p>(1) According to the position line of the stirrup, move the stirrup which has been set up upward and bind it from top to bottom. It is better to bind it with wrapping buckle.<\/p>\n\n\n\n<p>(2) The stirrup and the main reinforcement should be vertical, the intersection of the stirrup corner and the main reinforcement should be bound, and the intersection point of the main reinforcement and the non corner part of the stirrup should be bound in a plum blossom staggered manner.<\/p>\n\n\n\n<p>(3) The overlapping position of stirrup hook shall be staggered along the vertical reinforcement of column and bound firmly.<\/p>\n\n\n\n<p>(4) In areas with seismic requirements, the end of column stirrup shall be bent to 135 \u00b0 and the length of straight part shall not be less than 10d (D is stirrup diameter). If the stirrup adopts 90 \u00b0 lap joint, the lap joint shall be welded, and the weld length of single side weld shall not be less than 5D.<\/p>\n\n\n\n<p>In short, in the lashing of columns and bars, it is necessary to pay attention to details, pay attention to skills, ensure safety, and strictly control the quality of lashing to ensure the overall safety of the building.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-a14fa6d2\"><h2 class=\"uagb-heading-text\">Column Reinforcement Binding Requirement<\/h2><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"900\" height=\"600\" src=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Rebar-testing.jpg\" alt=\"Column reinforcement strapping requirements\" class=\"wp-image-4228\" srcset=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Rebar-testing.jpg 900w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Rebar-testing-600x400.jpg 600w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Rebar-testing-300x200.jpg 300w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/Rebar-testing-768x512.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"900\" height=\"600\" src=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/reinforcing-steel-el-paso.jpg\" alt=\"Column reinforcement strapping condition\" class=\"wp-image-4229\" srcset=\"https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/reinforcing-steel-el-paso.jpg 900w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/reinforcing-steel-el-paso-600x400.jpg 600w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/reinforcing-steel-el-paso-300x200.jpg 300w, https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/07\/reinforcing-steel-el-paso-768x512.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Binding position: The column body and top must be bound. The binding position should be on the inside of the sloped surface above and below the column, the distance from the top plate should not be less than 200mm, the distance from the bottom of the column should not be less than 150mm, to facilitate the cutting and connection of the steel bar, and to ensure that the binding is firm.<\/li>\n\n\n\n<li>Binding method: The binding should adhere to the four-word principle, that is, &#8220;tight, flat, fast&#8221;. The binding of the rebar needs to be carried out at the position of the connection of the rebar; the two rebars are set in a ring; and then they are tightly twisted into a circle with the binding wire; and the two ends are left with enough length, not to fall off or loose.<\/li>\n\n\n\n<li>Binding cable material: Galvanized iron wire or threaded steel bar is recommended. These materials not only have good plasticity, but also have the advantages of strong corrosion resistance.<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-8837e544\"><h2 class=\"uagb-heading-text\">Column steel <a href=\"https:\/\/wanzhisteels.com\/fr\/\" title=\"Suppliers &amp; Manufacturers\">Suppliers &amp; Manufacturers<\/a><\/h2><\/div>\n\n\n\n<p>Wanzhi Steel as a professional steel manufacturer and supplier.  Here, you can find the products you need, we can also produce the products you need according to your requirements.  We very welcome your inquiry contact.<\/p>\n\n\n\n<div class=\"wp-block-uagb-social-share uagb-social-share__outer-wrap uagb-social-share__layout-horizontal uagb-block-95e4268d\">\n<div class=\"wp-block-uagb-social-share-child uagb-ss-repeater uagb-ss__wrapper uagb-block-811cb1e9\"><span class=\"uagb-ss__link\" data-href=\"https:\/\/www.facebook.com\/sharer.php?u=\" tabindex=\"0\" role=\"button\" aria-label=\"facebook\"><span class=\"uagb-ss__source-wrap\"><span class=\"uagb-ss__source-icon\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\"><path d=\"M504 256C504 119 393 8 256 8S8 119 8 256c0 123.8 90.69 226.4 209.3 245V327.7h-63V256h63v-54.64c0-62.15 37-96.48 93.67-96.48 27.14 0 55.52 4.84 55.52 4.84v61h-31.28c-30.8 0-40.41 19.12-40.41 38.73V256h68.78l-11 71.69h-57.78V501C413.3 482.4 504 379.8 504 256z\"><\/path><\/svg><\/span><\/span><\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-social-share-child uagb-ss-repeater uagb-ss__wrapper uagb-block-e5fbb157\"><span class=\"uagb-ss__link\" data-href=\"https:\/\/twitter.com\/share?url=\" tabindex=\"0\" role=\"button\" aria-label=\"twitter\"><span class=\"uagb-ss__source-wrap\"><span class=\"uagb-ss__source-icon\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\"><path d=\"M400 32H48C21.5 32 0 53.5 0 80v352c0 26.5 21.5 48 48 48h352c26.5 0 48-21.5 48-48V80c0-26.5-21.5-48-48-48zm-48.9 158.8c.2 2.8 .2 5.7 .2 8.5 0 86.7-66 186.6-186.6 186.6-37.2 0-71.7-10.8-100.7-29.4 5.3 .6 10.4 .8 15.8 .8 30.7 0 58.9-10.4 81.4-28-28.8-.6-53-19.5-61.3-45.5 10.1 1.5 19.2 1.5 29.6-1.2-30-6.1-52.5-32.5-52.5-64.4v-.8c8.7 4.9 18.9 7.9 29.6 8.3a65.45 65.45 0 0 1 -29.2-54.6c0-12.2 3.2-23.4 8.9-33.1 32.3 39.8 80.8 65.8 135.2 68.6-9.3-44.5 24-80.6 64-80.6 18.9 0 35.9 7.9 47.9 20.7 14.8-2.8 29-8.3 41.6-15.8-4.9 15.2-15.2 28-28.8 36.1 13.2-1.4 26-5.1 37.8-10.2-8.9 13.1-20.1 24.7-32.9 34z\"><\/path><\/svg><\/span><\/span><\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-social-share-child uagb-ss-repeater uagb-ss__wrapper uagb-block-3fda4fb5\"><span class=\"uagb-ss__link\" data-href=\"https:\/\/pinterest.com\/pin\/create\/link\/?url=\" tabindex=\"0\" role=\"button\" aria-label=\"pinterest\"><span class=\"uagb-ss__source-wrap\"><span class=\"uagb-ss__source-icon\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\"><path d=\"M448 80v352c0 26.5-21.5 48-48 48H154.4c9.8-16.4 22.4-40 27.4-59.3 3-11.5 15.3-58.4 15.3-58.4 8 15.3 31.4 28.2 56.3 28.2 74.1 0 127.4-68.1 127.4-152.7 0-81.1-66.2-141.8-151.4-141.8-106 0-162.2 71.1-162.2 148.6 0 36 19.2 80.8 49.8 95.1 4.7 2.2 7.1 1.2 8.2-3.3 .8-3.4 5-20.1 6.8-27.8 .6-2.5 .3-4.6-1.7-7-10.1-12.3-18.3-34.9-18.3-56 0-54.2 41-106.6 110.9-106.6 60.3 0 102.6 41.1 102.6 99.9 0 66.4-33.5 112.4-77.2 112.4-24.1 0-42.1-19.9-36.4-44.4 6.9-29.2 20.3-60.7 20.3-81.8 0-53-75.5-45.7-75.5 25 0 21.7 7.3 36.5 7.3 36.5-31.4 132.8-36.1 134.5-29.6 192.6l2.2 .8H48c-26.5 0-48-21.5-48-48V80c0-26.5 21.5-48 48-48h352c26.5 0 48 21.5 48 48z\"><\/path><\/svg><\/span><\/span><\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-social-share-child uagb-ss-repeater uagb-ss__wrapper uagb-block-1e6802a9\"><span class=\"uagb-ss__link\" data-href=\"https:\/\/www.linkedin.com\/shareArticle?url=\" tabindex=\"0\" role=\"button\" aria-label=\"linkedin\"><span class=\"uagb-ss__source-wrap\"><span class=\"uagb-ss__source-icon\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\"><path d=\"M416 32H31.9C14.3 32 0 46.5 0 64.3v383.4C0 465.5 14.3 480 31.9 480H416c17.6 0 32-14.5 32-32.3V64.3c0-17.8-14.4-32.3-32-32.3zM135.4 416H69V202.2h66.5V416zm-33.2-243c-21.3 0-38.5-17.3-38.5-38.5S80.9 96 102.2 96c21.2 0 38.5 17.3 38.5 38.5 0 21.3-17.2 38.5-38.5 38.5zm282.1 243h-66.4V312c0-24.8-.5-56.7-34.5-56.7-34.6 0-39.9 27-39.9 54.9V416h-66.4V202.2h63.7v29.2h.9c8.9-16.8 30.6-34.5 62.9-34.5 67.2 0 79.7 44.3 79.7 101.9V416z\"><\/path><\/svg><\/span><\/span><\/span><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Column Reinforcement Lashing Technique 1. Column reinforcement Process flow: Connection of vertical load-bearing bars \u2192 drawing of stirrup spacing line \u2192 setting column stirrup \u2192 binding stirrup 2. The connection mode of stress-bearing reinforcement must meet the design requirements. 3. Draw the stirrup spacing line: On the vertical reinforcement of the column, mark the stirrup [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1951,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[18],"tags":[56,54],"class_list":["post-1950","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-galvanized","tag-gi"],"aioseo_notices":[],"uagb_featured_image_src":{"full":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088.jpg",1024,768,false],"thumbnail":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088-150x150.jpg",150,150,true],"medium":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088-300x225.jpg",300,225,true],"medium_large":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088-768x576.jpg",768,576,true],"large":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088.jpg",1024,768,false],"1536x1536":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088.jpg",1024,768,false],"2048x2048":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088.jpg",1024,768,false],"trp-custom-language-flag":["https:\/\/wanzhisteels.com\/wp-content\/uploads\/2024\/04\/720290709_1316696088.jpg",16,12,false]},"uagb_author_info":{"display_name":"wanzhigroup","author_link":"https:\/\/wanzhisteels.com\/fr\/author\/wanzhigroup\/"},"uagb_comment_info":0,"uagb_excerpt":"Column Reinforcement Lashing Technique 1. Column reinforcement Process flow: Connection of vertical load-bearing bars \u2192 drawing of stirrup spacing line \u2192 setting column stirrup \u2192 binding stirrup 2. The connection mode of stress-bearing reinforcement must meet the design requirements. 3. Draw the stirrup spacing line: On the vertical reinforcement of the column, mark the stirrup\u2026","_links":{"self":[{"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/posts\/1950","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/comments?post=1950"}],"version-history":[{"count":0,"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/posts\/1950\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/media\/1951"}],"wp:attachment":[{"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/media?parent=1950"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/categories?post=1950"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wanzhisteels.com\/fr\/wp-json\/wp\/v2\/tags?post=1950"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}